Skip to content
CIAP Platform

An integrated platform. Not a single machine.

CIAP—the Circular Infrastructure Alliance Platform—connects waste processing, materials recovery and local resource production through shared modular infrastructure for geographically and economically constrained locations.

CIAP is not starting from scratch. Specific technologies and processes have commercial precedent; bringing them together reliably is the development challenge. Technologies are selected for local needs; not every application incorporates every recovery system.

The solution in motion

From landfill diversion
to construction materials.

Divert suitable waste from landfill, use controlled thermal treatment and recover its mineral content for construction materials. Suitable organics follow a parallel composting pathway.

organic fractionAPCRdiverted01 · Landfill diversion02 · Thermal treatment03 · Mineral recoveryIBA · developmentAggregatesBlocksCompostingSoil amendment

Two distinct residues, two qualified routes: APCR is used in the established accelerated-carbonation aggregate route; incinerator bottom ash (IBA) is the RPU development opportunity. Converging lines show potential product destinations, not automatic mixing. Separate treatment, material testing, leaching and end-use requirements apply; IBA compliance has not been established. Mineralisation may generate carbon benefits, subject to verification.

The benefits

Less waste buried. More value kept locally.

Reduce landfilling and pollution pressure

Sorting, recovery, composting and controlled thermal treatment can reduce waste needing disposal. Less new landfill can reduce future leachate and land pressure; emissions and remaining residues still require compliant management.

Make construction materials locally

Suitable treated residues may substitute imported aggregates. Commercial ash-to-material building blocks exist, but local ash chemistry, leaching and product standards need validation. Biomass cementitious materials remain in development.

Create a route to better land use

Reducing disposal can slow landfill expansion and preserve scarce land. Existing sites need assessment, remediation, safe closure and approval before alternative uses.

Match capacity to changing needs

A modular configuration supports staged capacity and potential redeployment, subject to transport, site readiness and engineering—not a dedicated unit or fixed visit schedule for every island.

Spread risk across multiple assets

One thermal-line outage need not stop other lines. Shared services, utilities, logistics and staffing remain common dependencies requiring safeguards.

Recover useful by-products

Metals, feedstock-specific chemicals, compost, useful heat, power and potential water provide secondary value where feasible. Mineralisation may generate carbon benefits, subject to verification.

Review the problems this responds to
The integrated capability

Waste. Materials. Supporting recovery.

Waste and thermal conversion

Sort waste, recover suitable metals and organics, and thermally treat suitable residual fractions. Moving-grate is the current conceptual basis, with alternatives assessed in feasibility.

Minerals and construction materials

Conditioning and CO₂ mineralisation support potential aggregate and block production. Vitrification is a possible engineering pathway, not a validated CIAP installation.

Biomass and research

Assess feedstock-specific chemical extraction, residual thermal conversion and potential cementitious materials. Appropriate organics have a parallel composting pathway.

Supporting energy and water

Useful heat, energy recovery, PV/BESS and potential water systems support site operations where viable. No water output is guaranteed.

Explore products and outputs
Open the detailed resource diagram
Shared infrastructure

Specialist capability, shared across applications.

Explore shared deployment
Local employment

Potential jobs across the whole resource pathway.

Local materials production can support employment beyond the processing plant: skilled operations, maintenance, deliveries and shared services. Training and local workforce development would form part of deployment planning.

Block and aggregate manufacturing

Potential roles in block manufacture, aggregate production, material testing, quality control and product dispatch—keeping more construction-material value locally.

Metals extraction and recovery

Sorting, metals separation and recovery, equipment operation and preparation of recovered metals for local use or onward sale.

Thermal treatment and waste-to-energy

General thermal-treatment (incineration) operation, emissions monitoring, maintenance and site safety, with waste-to-energy operating roles where energy recovery is viable.

Sand batteries and heat delivery

Where feasible, sand-battery thermal-storage operation and maintenance, alongside logistics and deliveries for useful heat services.

Desalination and water delivery

Potential desalination plant operation, water-quality monitoring, maintenance, storage and water deliveries where a viable, approved water system is included.

Marine work and disaster response

Potential barge crews, marine engineering, mooring and transport roles where barge deployment is feasible; post-disaster response planning, logistics and safe debris-processing operations where authorised.

These are potential employment pathways, not confirmed jobs, recruitment offers or job-count forecasts. Roles depend on feasibility, local demand, funding, approvals, safety requirements and training. Energy, sand-battery, desalination, marine and disaster-response activities are conditional options, not committed services.

Development challenge

Integration, validation and demonstration.

Specific mature components are positioned at TRL 9. Research sits at TRL 4, the conceptual RPU at TRL 4–5 and the integrated CIAP system at TRL 3–4. These plan-stated positions are not independent certification. The industrial-scale pilot targets TRL 6–7.

Review technology and TRL
Alliance participants

Alliance status

Status as of October 2026. AFRY and University of Greenwich have agreed to be listed. Their scope remains subject to appropriate agreements; other participation is not confirmed.

AFRY

Technical consultants · agreed to be listed

University of Greenwich

Materials research and technical expertise · agreed to be listed

Engineering and technology participants

Under Evaluation · participation not confirmed

Operations and programme delivery

Under Evaluation · participation not confirmed

Research and validation roles
Development support

Build the evidence for deployment.

The immediate requirement is grants and technical assistance for feasibility, integration and an industrial-scale pilot—not current equity fundraising.

Support the Feasibility & Pilot