Risk Register

What the model solves —
and what is still open.

A candid view of the risks CIAP closes, the ones it reduces, and the work still in progress. Investors can reach this register directly — it is kept current as the programme develops.

Risk register

What the model solves — and what is still open.

A candid view of the risks CIAP closes, the ones it reduces, and the work still in progress.

SolvedAddressed by the CIAP model.
  • Single-revenue-stream contract collapse

    Solved

    The 2021 ReGen/Dart waste-to-energy PPP in Cayman collapsed after the power purchase agreement with the local utility was never finalised — one missing agreement stalled the entire project, at a cost of over $17.7M in exit costs. CIAP does not depend on any one revenue stream: tipping fees, aggregate and fill material sales, heat offtake and CDR credits are independent income lines. Tipping fees alone can sustain the project.

  • Misinformation in sector data

    Solved

    A widely circulated “Aruba WTE success story” claiming 90% diversion and significant electricity generation is not supported by primary sources. The actual record shows an open-dump history, a 2014 recycling suspension and continuing operator dysfunction. CIAP's public materials correct this record rather than repeat it.

AlleviatedRisk reduced, not eliminated.
  • Pre-close exposure from multiple simultaneous roles

    Alleviated

    FEG IIG typically holds operator, equipment supplier and technical designer roles at once in territory negotiations — more exposure than a typical PPP financier carries before contracts close. This is actively managed through an Early Works Agreement Term Sheet, modelled on the ReGen/Dart precedent, but the underlying multi-role exposure remains part of the structure.

  • Pooled-equity cluster risk

    Alleviated

    Where several territories share a single-cluster investment vehicle, one territory's failure can affect the others. A governance framework identifies and manages this exposure, but the shared structure itself is not removed.

OpenActive work, not yet resolved.
  • Desalination technology confirmation

    Open

    CIAP's desalination pathway is thermally driven, requiring a custom thermal desalination skid rather than standard containerised reverse osmosis. Vendor confirmation is in progress with three shortlisted suppliers to confirm thermal (not RO) capability at the required capacity.

  • Cause-specific mitigation mapping

    Open

    The seven static-plant failure cases are documented by capacity lost, but individual failure causes — equipment failure, contractor insolvency, operator dysfunction, contract collapse — have been fully mapped for only one case. Matching each remaining case to its cause and corresponding CIAP mitigation is ongoing.

Case detail available on request.

Every solved risk traces back to the same design choice — modularity with independence.